MOLD REMEDIATION · PROJECT GALLERYCSLB #1156896 · C-61/D-64
WATER DAMAGESERVICESOC323-673-3319

INSIDE THE PROJECT

From opened surfaces
through drying and repairs.

This downstairs project involved ceiling access and lifted flooring, followed by drying equipment and moisture checks. The later photographs follow the ceiling, flooring and trim repairs, with videos of the finishing and bathroom completion stages.

Drying and monitoring

Air movers and a dehumidifier served the opened work area. The selected photographs include meter readings taken during the drying work.

Repairs and finish work

The repair sequence shows replacement ceiling drywall, joint finishing, surface blending and details of the flooring and trim. These stages form part of this past project.

See the work in sequence

Explore seventeen photographs and two videos in the selected order. Use the stage buttons to focus on the drying, monitoring, repairs or completion walkthrough, and open any photograph for a closer look.

The bathroom ceiling opened for access to the area above.

Initial ceiling opening

The bathroom ceiling opened for access to the area above.

A closer view of the opened ceiling and concealed services.

Ceiling cavity access

A closer view of the opened ceiling and concealed services.

Flooring sections lifted during access to the affected area.

Flooring removal

Flooring sections lifted during access to the affected area.

A close view of a removed flooring section.

Flooring detail

A close view of a removed flooring section.

Flooring removed along the wall beside the built-in shelving.

Opened flooring beside the wall

Flooring removed along the wall beside the built-in shelving.

An air mover positioned beside the opened closet area.

Air mover at the closet

An air mover positioned beside the opened closet area.

Drying equipment arranged in and around the affected rooms.

Drying equipment setup

Drying equipment arranged in and around the affected rooms.

A meter reading documented during the drying work.

Moisture check during drying

A meter reading documented during the drying work.

Air movers and a dehumidifier serving the opened floor area.

Drying the opened floor area

Air movers and a dehumidifier serving the opened floor area.

A later meter reading documented with the drying equipment in place.

Follow-up moisture check

A later meter reading documented with the drying equipment in place.

Replacement drywall fitted across the opened bathroom ceiling.

Replacement ceiling drywall

Replacement drywall fitted across the opened bathroom ceiling.

Joint compound applied along the replacement ceiling seams.

Ceiling joint finishing

Joint compound applied along the replacement ceiling seams.

The bathroom ceiling during surface preparation and finishing.

Ceiling finish preparation

The bathroom ceiling during surface preparation and finishing.

The repaired ceiling area during finish blending.

Blending the ceiling finish

The repaired ceiling area during finish blending.

The flooring and lower wall trim during the repair stages.

Floor and trim repair detail

The flooring and lower wall trim during the repair stages.

Flooring and trim work beneath the built-in shelves.

Flooring at the shelving

Flooring and trim work beneath the built-in shelves.

Trim and flooring details at the adjoining closet openings.

Closet trim and flooring

Trim and flooring details at the adjoining closet openings.

Ceiling finish walkthrough

A video view of the repaired ceiling during the later finishing stage.

Bathroom completion walkthrough

A walkthrough of the bathroom and adjoining doorway after the repair work.

Enlarged project photograph

HAVE A SIMILAR PROPERTY CONCERN?

Talk through your next step.

323-673-3319
Call Marc · 323-673-3319