MOLD REMEDIATION · PROJECT GALLERYCSLB #1156896 · C-61/D-64
WATER DAMAGESERVICESOC323-673-3319

INSIDE THE PROJECT

Behind the cabinets.
Back to a finished kitchen.

Removing the kitchen cabinets exposed affected surfaces along the half-wall. The photographs follow the original condition, concealed damage, containment and the opened work area, then cabinet reinstallation and the finished kitchen.

Access and remediation

The early photographs show the affected wall behind the cabinets, protective containment, drying equipment and exposed framing around the plumbing.

Repairs and completion

The later photographs show the cabinet units back in position, the under-sink cabinet interior, and the countertop and sink in place. These stages form part of this past project.

See the work in sequence

Follow all nine photographs, or use the stage buttons to explore the remediation, repairs and finished kitchen. Open any photograph for a closer look.

Initial kitchen overview

01 · Initial kitchen overview

The kitchen before cabinet removal and access to the affected wall.

Growth behind the cabinets

02 · Growth behind the cabinets

Dark visible growth along the lower wall behind the cabinetry.

Concealed wall damage

03 · Concealed wall damage

Removing finishes reveals additional affected surfaces.

Containment and air filtration

04 · Containment and air filtration

Containment and air-filtration equipment.

Work area inside containment

05 · Work area inside containment

The opened half-wall and dehumidifier within containment.

Post-remediation wall access

06 · Post-remediation wall access

The exposed framing and plumbing after removal work.

Cabinet units reinstalled along the half-wall before the countertop returns.

07 · Cabinets back in position

Cabinet units reinstalled along the half-wall before the countertop returns.

The cabinet base, wall finish and under-sink connections after reassembly.

08 · Under-sink cabinet interior

The cabinet base, wall finish and under-sink connections after reassembly.

The countertop, backsplash and sink in place above the reinstalled cabinets.

09 · Finished countertop and sink

The countertop, backsplash and sink in place above the reinstalled cabinets.

Enlarged project photograph

HAVE A SIMILAR PROPERTY CONCERN?

Talk through your next step.

323-673-3319
Call Marc · 323-673-3319