Mold remediation projects / Water heater platform restoration
PROJECT PHOTOGRAPHS
Water heater platform restoration.
Follow this past project through platform reconstruction, surrounding wall repairs, finishing and the water heater back in place.
← All mold remediation projectsINSIDE THE PROJECT
From an open platform
to a finished installation.
This past project focused on the water-heater platform and surrounding wall area. The selected photographs follow the exposed framing, enclosure and finish work, ending with the heater back in position.
The repair stages
The photographs show the platform framing, replacement wall material, enclosed platform surfaces and finish preparation.
The completed project
The final views show the finished platform and the water heater in place above it.
See the work in sequence
Follow all eight photographs in the selected order, or use the stage buttons to focus on the repairs, finishing or completed project. Open any photograph for a closer look.

01 · Exposed platform framing
The platform framing and surrounding wall cavities exposed during the work.

02 · Work area overview
The open platform area with the water heater temporarily positioned beside it.

03 · Wall and platform repairs
Replacement wall material fitted around the platform, with its top still exposed.

04 · Platform enclosure
The platform enclosed at the front and sides during reconstruction.

05 · Platform surface detail
A closer view of the platform top and adjoining wall repairs.

06 · Preparing the finish
The repaired platform and wall area during finishing, with equipment in the work area.

07 · Finished platform
The platform top, sides and surrounding walls after finishing.

08 · Water heater back in place
The water heater in place above the finished platform.
HAVE A SIMILAR PROPERTY CONCERN?