MOLD REMEDIATION · PROJECT GALLERYCSLB #1156896 · C-61/D-64
WATER DAMAGESERVICESOC323-673-3319

INSIDE THE PROJECT

From an open platform
to a finished installation.

This past project focused on the water-heater platform and surrounding wall area. The selected photographs follow the exposed framing, enclosure and finish work, ending with the heater back in position.

The repair stages

The photographs show the platform framing, replacement wall material, enclosed platform surfaces and finish preparation.

The completed project

The final views show the finished platform and the water heater in place above it.

See the work in sequence

Follow all eight photographs in the selected order, or use the stage buttons to focus on the repairs, finishing or completed project. Open any photograph for a closer look.

The platform framing and surrounding wall cavities exposed during the work.

01 · Exposed platform framing

The platform framing and surrounding wall cavities exposed during the work.

The open platform area with the water heater temporarily positioned beside it.

02 · Work area overview

The open platform area with the water heater temporarily positioned beside it.

Replacement wall material fitted around the platform, with its top still exposed.

03 · Wall and platform repairs

Replacement wall material fitted around the platform, with its top still exposed.

The platform enclosed at the front and sides during reconstruction.

04 · Platform enclosure

The platform enclosed at the front and sides during reconstruction.

A closer view of the platform top and adjoining wall repairs.

05 · Platform surface detail

A closer view of the platform top and adjoining wall repairs.

The repaired platform and wall area during finishing, with equipment in the work area.

06 · Preparing the finish

The repaired platform and wall area during finishing, with equipment in the work area.

The platform top, sides and surrounding walls after finishing.

07 · Finished platform

The platform top, sides and surrounding walls after finishing.

The water heater in place above the finished platform.

08 · Water heater back in place

The water heater in place above the finished platform.

Enlarged project photograph

HAVE A SIMILAR PROPERTY CONCERN?

Talk through your next step.

323-673-3319
Call Marc · 323-673-3319